If you are wanting a system that works all day every day with the ability of remote monitoring, please call one of our friendly engineering team today to discuss your treatment options.
Baralaba Coal | Ecofarmer 250 Wastewater Treatment Plant
Client:
Fraser Level
Industry:
Hospitality
Location:
Central Queensland
Technology Implemented:
Ecofarmer 250

Background
RWTS with client representative Fraser Lever set out to design a suitable wastewater treatment facility for the Baralaba Caravan Park located in Central Queensland
The RWTS Solutions
CUSTOM BUILT WASTEWATER TREATMENT PLANT
The solution was our Advance Ecofarmer 250 platform allowing for full automation across the site. This Ecofarmer saw a complete site integration between the main pump station, remote pump station and irrigation field tank level, flow data and solenoid control in field including a wet weather solution closed out the RWTS scope.
Result
NEED AN INNOVATIVE SYSTEM THAT DOES NOT FAIL?

Based in Brisbane, we’ve operated for over 10 years across Australia and the Asia-Pacific, with proven technology backed by global partners and ongoing R&D
Company
Our People
Projects
Download Our Corporate Brochure

Services
Design & Engineering
Project Management
Manufacturing and Fabrication
Waste Management
Installation & Commissioning
Site Compliance
Onsite Maintenace
Quality Parts & Consumables
Locations

Copyright © 2025. Remote WTS